Well Selection - First you must select wells , perhaps by area, vintage, status, cum production, etc.
Scanning - Well documents can be scanned by you or third party vendors which we can arrange
(Note: you do not need to have well documents scanned. Data entry can be done
using electronic files such as word/excel/acrobat).
Data Entry Process - Suhaka Consulting has trained personnel ready to complete the data entry, or you can choose to enter the data yourself.
Engineering Process - Our engineers look over the data entry results to ensure accuracy and completeness. They also ensure every major production decline curve inflection point has an associated event.
Allocation - There are two parts to allocation:
- The program can automatically or manually prorate lease production to the well level.
- You can also allocate down to the formation manually.
Statistics - After data entry and engineering are complete, statistics such as event based
incremental production, net open perf height, current open formation subzones, cums, etc.
are calculated and added to the database.
Increased Production!